Our Professional Service
We offer a full range of services from product design, mold designing, and making, to plastic part molding, printing, assembly, packaging, and shipping arrangements. With over 20 years of production experience, we provide complete manufacturing solutions.
- Free Design Service: Physical sample analysis and free part design work.
- Free Mold: Mold fee refund available when quantity reaches specific targets.
- Fast Mold: Simple and urgent molds can be finished in as little as 15 days.
- End-to-End Solutions: Expertise in precision injection molding and related manufacturing.
Our Quality Assurance
We have obtained certificates for ISO9001, ISO14001, and IATF16949 along with various patent certifications. Our quality process includes:
- Pre-sale: 24-hour online service with fast inquiry response.
- In-sale: Transparent production process with regular photo and video updates.
- Quality Control: 3-stage quality checking from raw material to finished product (100% inspection).
- After-sale: Regular customer visits and 99%+ quality acceptance rate.
FAQ
Q: Are you a trading company or a manufacturer?
A: We are a factory based in Mainland China, and we warmly welcome your visit to our facilities at any time.
Q: How do you handle product warranties?
A: We conduct a 100% inspection on all products. If any quality issues arise, we provide a 1-year warranty and will arrange for 100% re-work or parts return.
Q: What are your standard terms of payment?
A: For payments under 1000 USD, 100% in advance. For payments over 1000 USD, 30% T/T in advance and the balance before shipment.
Q: What materials can you use for plastic gears?
A: we work with a wide range of materials including ABS, Nylon, POM, PA6, PA66, MC, PTFE, TPEE, LCP, PVC, PP, and PE to meet different application requirements.
Q: Can you provide customized transmission solutions?
A: Yes, customizing various gearboxes and transmission schemes per customer requirements is our specialty.
Q: How long does it take to finish a new mold?
A: For simple and urgent mold requests, we can speed up the process to finish the mold and send out samples within 15 days.